Vanner RE Series Manual de instalación Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
Installation and Start-up
Copyright
2001 Phone: (614) 771-2718 RE-ACM
Vanner Inc. FAX: 614-771-4904 Owners/Installation Manual
4282 Reynolds Dr. www.vanner.com Rev 0.1a
Hilliard Ohio 43026 RE-ACM-Owners_Man_R01a.doc
19
INCORPORATED
INCORPORATEDINCORPORATED
INCORPORATED
Verify that the AC utility cables are still disconnected from the AC Utility. Insert AC utility cables through
the entry/exit port and into the AC wiring raceway. Connect L1, N, L2 and ground to the appropriate
terminals in the terminal strip and torque each of the AC terminal screws to 15 inch pounds. Re-torque
after 30 days.
Inverter AC Input Connection:
Connect 240 Volt Vrms Three wire Inverter Input L1, L2, N, and GND to
the Inverter AC Input on the RE-4500 using 12 gauge wire minimum (10 gauge recommended for best
performance).
Verify that the RE-4500 is off and that the AC utility cables are still disconnected from the AC Utility.
Insert Inverter AC Input cables through the entry/exit port and into the AC wiring raceway. Connect L1, N,
L2 and ground to the appropriate terminals in the terminal strip and torque each of the AC terminal
screws to 15 inch pounds. Re-torque after 30 days.
Inverter AC Output:
Connect 120/240 volt single phase load L1, L2, N, GND to AC output terminals
using 12 gauge wire minimum (10 gauge recommended for best performance). Please refer to the AC
Interconnection Figure
Verify that the RE-4500 is off and that the AC power is still disconnected from the AC Utility. Insert
Inverter AC Output cables through the entry/exit port and into the AC wiring raceway. Connect L1, N, L2
and ground to the appropriate terminals in the terminal strip and torque each of the AC terminal screws to
15 inch pounds. Re-torque after 30 days.
Chassis Ground (28):
Connect to compression fitting terminal using 12 gauge wire minimum (10 gauge
recommended for best performance).
Use the Chassis Ground compression fitting (28) to ground the chassis using 10 gauge wire. . Connect
the chassis ground wire to the compression fitting and torque the bolt to 75 inch pounds. Re-torque after
30 days.
5.3 DC Raceway Wiring Installation Procedure
This section covers the interconnection and wiring of the RE-ACM DC Raceway (shown below in Figure
5.3-1. The major connections that need to be made are the connections for the control cable back to the
RE-4500 (Vanner Part Number TBD), and the connections for the
Start
” and “
Run
” contacts for the
generator.
F 9 Figure 5.3-1 ACM DC Raceway Connections
RIGHT
BACK
FRONT
LEFT
DC RACEWAY
GENERATOR
CONTROL
START
GND
RUN
+24V
Generator Control
Connector
Generator Control
Terminals
Vista de pagina 18